$105 Million USDA Loan Guarantee for Waste to Biofuel Facility – USA
Posted on August 12, 2012 by DrRossH in Landfills and Disposal
$105 Million USDA Loan Guarantee for Waste to Biofuel Facility – Waste Mangagement World.
The facility is expected to convert processed municipal solid waste (MSW) into around 10 million gallons (38 million litres) of ethanol annually as well as renewable energy to be used on-site.
The Sierra BioFuels Plant is the first of several projects that Fulcrum said that it is currently developing.
According to the biofuel specialist it currently has projects in various stages of development throughout North America that will produce more than 700 million gallons (2.6 billion litres) of renewable fuel and remove more than 13 millions tons (11.8 million tonnes) of garbage from landfills per year.

How many people today grab a takeaway coffee cup from the local cafe to drink on the go? We don’t know, but the number must be enormous.. Most every one of the above have a plastic top that will last 100s of years. Some cafes still use plastic cups that last a similar time. Is 10 minutes of coffee worth 100s of years of trash?
These items can be seen littering our gutters and on our streets all over the place. If they were all cardboard, they would still be littered, but they would, at least, be gone in a short time.
They do not need to be made of plastic.
On the way home from the gym last week, a distance of about 1 km (1/2 mile), I counted the items of plastic litter on the curb as I walked. In that short distance I counted 63 pieces of plastic litter. Plastic drink bottles, bottle tops, candy wrappers, plastic film, polystyrene fragments etc. That seemed to be a lot to me. I guess it is a generational thing. Our parents would have been horrified to see that amount, whereas it seems to go unnoticed by our youth of today. In another 20 years how many pieces will there be on this stretch, -- 200? What will today’s youth think of that new amount then when they are older? Will their children be so readily accepting of a higher amount of litter?
Discussion · No Comments
There are no responses to "$105 Million USDA Loan Guarantee for Waste to Biofuel Facility – USA". Comments are closed for this post.Oops! Sorry, comments are closed at this time. Please try again later.