Waste Gasification, AD and MBT Facility Planned for Milton Keynes – UK

Waste Gasification, AD and MBT Facility Planned for Milton Keynes – UK

Posted on July 2, 2013 by DrRossH in Landfills and Disposal

Waste Gasification, AD and MBT Facility Planned for Milton Keynes – Waste Management World.

According to AmeyCespa, these technologies will help extract more recyclable materials, as well as generate enough to power for the equivalent of 11,000 homes 

Further benefits were said to include reduced costs for local waste management – a saving of more than £50million over the design life of the facility, a 95% reduction in landfill, 45 permanent jobs and an on-site visitor and education centre for use by schools and the wider community